The 14 km length buried 30kV transmission line, that connects the Wind Farm “Banzi” to the existing Transmission System Operator S\S “Genzano”, has been designed in an area characterized by the presence of a dense network of underground services detected through the use of georadar techniques.

The detailed design was performed complying national and local norms, including all the requested documents to obtain the necessary clearance from public entities.

Detailed design included main steady state power electrical studies as: power flows analysis, short circuit and earthing studies and EFM evaluation, carried out to verify the compliance with national and international standards as well as the client technical specifications.

Fast facts

Name

WF “Banzi” – S\S “Genzano”

Location

Banzi

Country/Region

Italy

Client

Gamesa

Circuit

multiple

Conductor

ARG7H1R cables

Type:

Buried

Voltage:

30 kV

Length:

14 km

Services

Detailed design,
Geophysical surveys

Hours

2100

 

 

 


  Country Projects Map


Open in a new window

  Our Figures

Open in a new window

This site uses cookies, including third parties. By closing this banner, scrolling through this page or by clicking any element its consent to the use of cookies.
If you want to learn more or opt out of all or some cookies go on info