Solar PV "Montalto di Castro"

 

  • 01.jpg
  • 02.jpg
  • 03.jpg
  • 04.jpg

 

Overview

The 12 MW “Montalto di Castro” photovoltaic power plant is located in an area of uneven orography and has required in addition to the detailed design, the structural, functional and performance systems tests. Mounting modules structures and inverter cabins structural calculations have been performed complying the national structural code.

The 5 km length 30kV buried transmission line, connected to the existing TSO S\S, was also designed redacting all documents required from public entites for the permit obtention as request by law.

Commissioning eng activities as functional and performance systems tests were carried on including: thermal imagery on all the modules for hot-spot detection and module replacement and inverters efficiency measurement complying CEI 82-25 norm.

Fast facts

Name

Caparecce

Location

Montalto di Castro (VT)

Country/Region

Italy

Client

Montealto SL

Technology

Photovoltaic

Rated Power

11 MW

Module Type

Crystalline

Transmission Line Type:

Buried

Transmission Line Voltage:

20 kV

Transmission Line Length:

5 km

Services

Detailed design,
Commissioning Eng

Hours

1790

 


  Country Projects Map


Open in a new window

  Our Figures

Open in a new window

This site uses cookies, including third parties. By closing this banner, scrolling through this page or by clicking any element its consent to the use of cookies.
If you want to learn more or opt out of all or some cookies go on info