The 200 MW wind farm project was drawn up in order to determine with accuracy the construction costs in order to bid competitive rates to the national Transmission System Operator (TEIAS).

The project was located in an area subject to pronounced karst phenomena and characterized by a dense presence of sinkholes with extremely poor accessibility areas.

The design is composed of a considerable number of documents as civil works were detailed designed completed of longitudinal profiles and cross sections using dynamic modeling CAD 3D software.

MV collector system cable sizing has been conducted by running the test calculations both in terms of power and in terms of energy considering the Weibull power curves.

The design included AIS step-up substation with two 100 MVA transformers and a 44 km lengths over-head TL including mechanical calculations, and electrical calculations performed by numerical computation software Scilab.

Fast facts

Name

Medreselik

Location

Medreselik

Country/Region

Turkey

Client

Enel Green Power

Technology

Wind

Rated Power

200 MW

WTGs num:

67

Transmission Line Type:

Overhead

Transmission Line Voltage:

154 kV

Transmission Line Length:

42 km

Substation type

Upgrade existing AIS Step-Up

Substation Voltage

154 kV

Services

GIS analysis,
Basic design

Hours

550

 


  Country Projects Map


Open in a new window

  Our Figures

Open in a new window

This site uses cookies, including third parties. By closing this banner, scrolling through this page or by clicking any element its consent to the use of cookies.
If you want to learn more or opt out of all or some cookies go on info